Ablution Area Renovation & Water Tank Installation
₹0 raised of ₹350,000 goal 0.00%- 0 Donations
- 104 days left
- 0 Likes
Ablution Area Renovation & Water Tank Campaign
Objective
Provide a clean, hygienic, and well-equipped ablution space for Salah (wudhu), including renovation of the ablution area and installation of a 5,000-litre concrete water tank for uninterrupted water supply.
Key Features
Target Audience
Expected Outcomes
Budget Estimate
Call to Action
Combined Detailed Estimate
(For materials, labour, and fixtures – including water tank):
ComponentEstimate Cost (₹)Ablution area demolition/prep8,000 – 12,000
Floor & wall tiling30,000 – 60,000
Anti-slip floor finish5,000 – 10,000
Plumbing (8–12 taps + drainage)50,000 – 80,000
Benches/seating15,000 – 30,000
Waterproofing10,000 – 20,000
Electrical/lighting/ventilation5,000 – 12,000
Miscellaneous fittings5,000 – 15,000
Contingency/overheads10,000 – 25,000
5,000-litre concrete water tank (materials & labour)1,45,000 – 1,95,000
Total Estimated Budget: ₹2.6 – 3.0 lakh
Objective
Provide a clean, hygienic, and well-equipped ablution space for Salah (wudhu), including renovation of the ablution area and installation of a 5,000-litre concrete water tank for uninterrupted water supply.
Key Features
- Medium Ablution Setup
- 8–12 taps for simultaneous use.
- Tiled floors and walls with anti-slip finish.
- Benches for seating while washing feet.
- Adequate drainage and water management.
- 5,000-Litre Concrete Water Tank
- RCC/Ferrocement tank with proper platform.
- Continuous water supply to taps.
- Waterproofing and long-term durability.
- Safety & Hygiene
- Non-slip flooring, proper ventilation, clean surfaces.
- Soap holders, mirrors, and waste bins.
- Separate areas for men and women, if needed.
Target Audience
- Visitors, staff, and patients of the facility.
- Community members using the mosque or prayer area.
Expected Outcomes
- Improved comfort and accessibility for Salah.
- Consistent water supply for ablution.
- Enhanced hygiene and safety standards.
- Positive community perception and satisfaction.
Budget Estimate
- Ablution area renovation: ₹1.8 – 2.3 lakh
- 5,000-litre concrete water tank: ₹1.45 – 1.95 lakh
- Total (Medium / Mid-Range setup): ₹2.6 – 3.0 lakh
Call to Action
- Support the project through donations, sponsorship, or volunteering.
- Share updates on social media to raise awareness and community involvement.
Combined Detailed Estimate
(For materials, labour, and fixtures – including water tank):
ComponentEstimate Cost (₹)Ablution area demolition/prep8,000 – 12,000
Floor & wall tiling30,000 – 60,000
Anti-slip floor finish5,000 – 10,000
Plumbing (8–12 taps + drainage)50,000 – 80,000
Benches/seating15,000 – 30,000
Waterproofing10,000 – 20,000
Electrical/lighting/ventilation5,000 – 12,000
Miscellaneous fittings5,000 – 15,000
Contingency/overheads10,000 – 25,000
5,000-litre concrete water tank (materials & labour)1,45,000 – 1,95,000
Total Estimated Budget: ₹2.6 – 3.0 lakh